Trevors build 7

The next job forward was to set up the inner panels and then the decks. The inner panels were skinned with F/G and resin to instructions and then spot glued on the lines. The joins between the panels and the hull were then filled and skinned with F/G tape and resin. We then set about fitting the side and rear decks. The three side deck panels were spot glued on the inside as per instructions and then fitted up to the hull. Once they were in the correct position  a 30 mm strip of panel was glued to the bottom of the left and right  (or should that be port and starboard ?) inner panel to form a flange to attach them to the hull later on. We then moved on to the rear deck panels and linked them up with the sides. Everything fitted to plan and the result can be seen in the attached photos.

IMG_20201017_111818-5.jpg IMG_20201019_092124-6.jpg IMG_20201019_092158-2.jpg IMG_20201019_092148-3.jpg IMG_20201017_111752-4.jpg IMG_20201016_174238-0.jpg IMG_20201016_174246-1.jpg

Trevors build 6
Trevors build 8

Leave a Comment