Here are a few videos of the late stages of the build and also early test runs. The craft is performing well and we just need lockdowns to end and. read more…
Trevor Barrett
Trevors build 19
We have had the craft back on the water with a few small mods. The single rear skirt has been replaced with anti scoop singles. The rudder throw has been. read more…
Trevors build 18
This post is about the trailer build. I looked at various designs around and decided I wanted one that would give the craft and skirts protection from the road. I. read more…
Trevors build17
Well as I said in the last post I had some bad things happen. This was major as the fan departed company from the craft. The pics show the resulting. read more…
Trevors build 16
Well a heap has gone down since my last post. I will try and put it into the next few posts. Some of it is good and some of it. read more…
Trevors build 15
I guess one of the most important tasks is setting up the transmission. Right or wrong this is how I tackled the job. I first looked at the transmission tower. read more…
Trevors build 14
The deck and duct has been painted with two pack epoxy paint. I didn’t get a perfect finish in some spots as the F/G mesh tended to show through. I. read more…
Trevors build 13
Well things are moving along now. The end is in sight. The engine mount assembly was a bit of work but it came out well. I used an alternative for. read more…
Trevors build 12
The transmission tower is now complete and was done pretty well to plan. Again keeping things accurate with hole centers and the like is key to getting a good build.. read more…
Trevors build 11
I have now finished mounting the duct to the hull. At first I fitted the mounting flanges to the duct while it was on the bench. This proved to be. read more…
Contact
- Login
- Sign Up